These coolers are huge and a semi-truck can turn around inside of the complex.
Week of April 30th
The precast concrete installed, one end of the building is being closed, and the front of the building is coming along.
Subscribe to:
Posts (Atom)
(480) 677-2372 info@thebfsc.com
The precast concrete installed, one end of the building is being closed, and the front of the building is coming along.