The Coolers

These coolers are huge and a semi-truck can turn around inside of the complex.

May 6th

More pictures of the outside. The mezanean down the center of the compex and over the snack bar.

May 1st

A look at the outside of the BFSC.

Week of April 30th

The precast concrete installed, one end of the building is being closed, and the front of the building is coming along.

Week of April 22nd

The precast concrete is being put into place for the coolers and the parking lot lights are put in.